Background

Projects

HVAC PROJECT AT TRAVIS AFB

Under a contract with the U.S. Air Force, PGI installed split cooling units at Travis Air Force Base. The project included demolition of existing equipment, construction of new drywall and ductwork, and installation of HVAC equipment, hardware and controls. The project was completed on time with no job-related illness or lost productivity.